PROJECT REALISATION

  • Design Project
  • Reorganization project
  • Industrial performance improvement
ASSISTANCE FOR DECISION MAKING « VISION PHASIS »
  • Technical-economic feasibility study
    • Layout definition, sizing
    • Assumptions
    • Global project plan
    • First economic estimate (cost, ROI)
  • Communication plan
ASSISTANCE FOR DESIGN « BASIC PRELIMINARY DESIGN PHASIS »
  • Detailed layout
  • Specifications
    • Technical specifications
    • Industrial program
    • Program definition for building
  • First consultation with suppliers
  • Implementation planning
  • Financial estimate (building, investments)
ASSISTANCE FOR IMPLEMENTATION « DETAILED PRELIMINARY DESIGN PHASIS »
  • Detailed specifications
    • Technical specifications
    • Final building program
  • Participation in consultations and choice of suppliers
  • Interactivity management between owners and contractors
  • Internal / external communication plan
  • Transfer management for industrial restart

PROJECT MANAGEMENT

  • Action plan
  • Follow-up planning
  • Follow-up indicators
  • Preparing and running project meetings
  • Draw up project files (transfer plan, communication plan, etc.)
  • Participating management, field management, visual management

TOOLS

We methods and tools to help decision-making. Secteur Productique could do 2D/3D representation, Simulation, Animation 3D thanks to differents kinds of tools:

Examples of work done

  • Schéma Directeur
    Master Plan

    Stategic plan, master plan, layout definition, road map, planning,step construction, cost estimation, ROI.
    7,000 m² of production space
    Sector Aeronautical mechanics
    Project time 2 months

  • Conception et implantation atelier
    Layout design

    Designing assembly shop and dimensioning implementation area.
    5,000m² workshop designed
    Cycle improved by 50%

    Sector Aeronautical mechanics
    Project time 8 months

  • Manutentions et servitudes aux postes
    Improving materials handling

    Industrial program, Industrial systems definition (handling, constraints and power supply).
    12,000m² workshop restructured
    Sector Aeronautical mechanics
    Project time 3 months

  • Transfert industriel
    Industrial transfer

    Managed the transfer, planning, road map, team coordination : 500 workstations transferred.
    20,000m² workshop restructured
    Sector Aeronautical Electronics
    Project time 6 months

Last news

Our skills

Expertise

Process, Supply Chain, Lean Manufacturing, Layout, Master plan.

Speciality: Manufacturing, Assembly, Sub-Assembly, Logistics, Handling, Robotics, Automation

Consulting

Secteur Productique can support you throughout your decision-making, design and implementation.

We can improve your potential. We ensure synergy between products, process, ressources, organizations.

Training

Secteur Productique provide to its customers training in Supply Chain and Lean Manufacturig. We could adapt training session case by case.
We could organize sessions around: Manufacturing, Assembly, Sub-Assembly, Logistics, Handling, Robotics, Automation

Design

Secteur Productique can support you throughout design and implementation project step:

  • Industrial unit conception / reorganization project (manufacturing, logistics, maintenance,...)
  • Industrial performance improvement project (physical and information system)
  • Deliverables: Preliminary Specifications, Technical Specifications, Industrial Program, Bulding Program, Financial and economic estimation,...